Skip to content

102 feat new configuration field to support skipping changes until a date #124

102 feat new configuration field to support skipping changes until a date

102 feat new configuration field to support skipping changes until a date #124

Triggered via pull request August 14, 2024 11:26
Status Failure
Total duration 19s
Artifacts

dcp.yml

on: pull_request
Matrix: dcp
Fit to window
Zoom out
Zoom in

Annotations

19 errors and 1 warning
dcp (5.0.1)
Process completed with exit code 1.
dcp (6.6.6)
The job was canceled because "_5_0_1" failed.
dcp (6.6.6)
Process completed with exit code 1.
dcp (6.5.2)
The job was canceled because "_5_0_1" failed.
dcp (6.5.2)
Process completed with exit code 1.
dcp (7.0.5)
The job was canceled because "_5_0_1" failed.
dcp (7.0.5)
Process completed with exit code 1.
dcp (6.0.5)
The job was canceled because "_5_0_1" failed.
dcp (6.0.5)
Process completed with exit code 1.
dcp (7.6.1)
The job was canceled because "_5_0_1" failed.
dcp (7.6.1)
Process completed with exit code 1.
dcp (5.1.3)
The job was canceled because "_5_0_1" failed.
dcp (5.1.3)
Process completed with exit code 1.
dcp (7.1.6)
The job was canceled because "_5_0_1" failed.
dcp (7.1.6)
The operation was canceled.
dcp (5.5.6)
The job was canceled because "_5_0_1" failed.
dcp (5.5.6)
The operation was canceled.
dcp (7.2.5)
The job was canceled because "_5_0_1" failed.
dcp (7.2.5)
Process completed with exit code 1.
dcp (5.0.1)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/setup-go@v4. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/