Skip to content

chore(prysk): make tests run in parallel #3646

chore(prysk): make tests run in parallel

chore(prysk): make tests run in parallel #3646

Triggered via pull request January 16, 2025 19:53
Status Cancelled
Total duration 6m 44s
Artifacts

turborepo-test.yml

on: pull_request
Matrix: Turborepo Integration
Matrix: rust_test
Turborepo Test Summary
0s
Turborepo Test Summary
Cleanup  /  cleanup
3s
Cleanup / cleanup
Fit to window
Zoom out
Zoom in

Annotations

8 errors, 9 warnings, and 6 notices
Turborepo Integration (windows-latest)
turborepo-tests-integration#test:parallel: command (D:\a\turborepo\turborepo\turborepo-tests\integration) C:\hostedtoolcache\windows\node\18.20.2\x64\pnpm.CMD run test:parallel exited (1)
Turborepo Integration (windows-latest)
Process completed with exit code 1.
Turborepo Rust testing on windows
Canceling since a higher priority waiting request for 'Turborepo Test-olszewski/chore_prysk_parrallel' exists
Turborepo Rust testing on windows
The operation was canceled.
Turborepo Rust testing on macos
Canceling since a higher priority waiting request for 'Turborepo Test-olszewski/chore_prysk_parrallel' exists
Turborepo Rust testing on macos
The operation was canceled.
Turborepo Integration (macos-13)
Canceling since a higher priority waiting request for 'Turborepo Test-olszewski/chore_prysk_parrallel' exists
Turborepo Integration (macos-13)
The operation was canceled.
Turborepo Examples
Failed to download action 'https://api.github.com/repos/pnpm/action-setup/tarball/fe02b34f77f8bc703788d5817da081398fad5dd2'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Turborepo Examples
Back off 28.658 seconds before retry.
Turborepo Integration (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Turborepo Integration (ubuntu-latest)
Failed to download action 'https://api.github.com/repos/Mozilla-Actions/sccache-action/tarball/9e326ebed976843c9932b3aa0e021c6f50310eb4'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Turborepo Integration (ubuntu-latest)
Back off 12.242 seconds before retry.
Turborepo Integration (macos-13)
HOMEBREW_NO_INSTALLED_DEPENDENTS_CHECK is set: not checking for outdated dependents or dependents with broken linkage!
Turborepo Test Summary
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Cleanup / cleanup
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
sccache stats
100% - 934 hits, 0 misses, 0 errors
sccache stats
0% - 0 hits, 0 misses, 0 errors
sccache stats
0% - 0 hits, 0 misses, 0 errors
sccache stats
0% - 0 hits, 0 misses, 0 errors
sccache stats
100% - 537 hits, 0 misses, 0 errors
sccache stats
0% - 0 hits, 0 misses, 0 errors